Senior Material Controller - Site Salta

and operation of a materials control system (ERM) for the site. Consolidates MTOs generated by Engineering into BOMs and assigns... and procedures. - Using ERM, provide continuous control of all materials and equipment from receipt at the site to final installed...

Lugar: Salta | 10/05/2026 17:05:43 PM | Salario: S/. No Especificado | Empresa: Worley

Risk Management Office | Manager

manager within the offshore team), and 50% will focus on enterprise risk management activities, including risk reporting, ERM...%) Enterprise Risk Management (ERM) Support the design, implementation, and continuous improvement of the Enterprise Risk...

Lugar: Buenos Aires | 07/05/2026 19:05:05 PM | Salario: S/. No Especificado | Empresa: PwC

Material Controller Administrator - Site Salta 14

in the maintenance and operation of a materials control system (ERM) for the site. Consolidates MTOs generated by Engineering...: Use of ERM system and reporting Assist in the maintenance and operation of a materials control system for the site...

Lugar: Salta | 03/03/2026 23:03:02 PM | Salario: S/. No Especificado | Empresa: Worley

Senior Material Controller - Site Salta

and operation of a materials control system (ERM) for the site. Consolidates MTOs generated by Engineering into BOMs and assigns... and procedures. · Using ERM, provide continuous control of all materials and equipment from receipt at the site to final installed...

Lugar: Salta | 03/03/2026 20:03:32 PM | Salario: S/. No Especificado | Empresa: Worley