Engineering Technician - Temp

and lead the time and raw material consumption studies aligned with the ABC Methodology B. Capacity study analysis for metals..., injection and compression area. C. To keep the BOMs (Materials Bill) and Rates of each part numbers updated in SAP. (Change...

Lugar: Veracruz, Ver. | 28/08/2026 17:08:08 PM | Salario: S/. No Especificado | Empresa: Eaton