enclosures, test fixtures, and mechanical structures. Interpret, revise, and redline technical drawings and engineering... and RF test equipment, including independent setup and troubleshooting using spectrum analyzers, oscilloscopes, DVMs, network...
plant automation equipment, including: analog and digital process control instrumentation, and area atmospheric monitoring... equipment. Diagnose issues using control logic diagrams, loop drawings, P&IDs, and related engineering documentation...
Lugar:
Phoenix, AZ | 07/05/2026 17:05:48 PM | Salario: S/. No Especificado | Empresa:
Linde, etc.) Field check design layouts Office check designs and redline changes Recognize process waste and suggest changes Work... Protection Equipment) with situational awareness Work in a safe manner always. This includes, but is not limited to, driving...
Lugar:
Aurora, IL | 07/05/2026 02:05:02 AM | Salario: S/. $45 - 70 per hour | Empresa:
MasTec, etc.) Field check design layouts Office check designs and redline changes Recognize process waste and suggest changes Work... Protection Equipment) with situational awareness Work in a safe manner always. This includes, but is not limited to, driving...
, etc.) Field check design layouts Office check designs and redline changes Recognize process waste and suggest changes Work... Protection Equipment) with situational awareness Work in a safe manner always. This includes, but is not limited to, driving...
professional at project team design meetings Prepares complex preliminary redline design layouts for estimating Performs... more complex calculations for a project, such as heating/cooling loads, equipment selection and sizing, friction loss calculations...
Office check designs and redline changes Recognize process waste and suggest changes Work in a team environment High... stakeholders through established tools or verbally Wearing and utilizing all required safety PPE (Personal Protection Equipment...
Lugar:
Aurora, IL | 06/05/2026 21:05:34 PM | Salario: S/. $45 - 70 per hour | Empresa:
MasTec Office check designs and redline changes Recognize process waste and suggest changes Work in a team environment High... stakeholders through established tools or verbally Wearing and utilizing all required safety PPE (Personal Protection Equipment...
stakeholders to resolve redline issues pragmatically, balancing legal risk, business objectives, and time to signature Guide... is frequently required to sit;use hands and fingers to work with objects, tools, or controls;and use office equipment including...
-voltage telecommunications equipment Reading and interpreting telecom plans, electrical one-lines, riser diagrams... pulling, panel terminations, and equipment grounding Familiar with seismic anchoring, bonding, and bracing of electrical...